Work described
From the filingBoiler replacement- replacement of the existing oil-fired boiler with a LP gas-fired Boiler by Navien model #NCB240/130 in accordance with manufacturer’s installation instructions and specifications. Gas check and electrical inspection with certificate is required for the final inspection for the issuance of a Certificate of Compliance. OIL Tank removal - Removing the existing twin oil tanks in accordance with specifications provided by JSP Home Services. Upon disposal of the tank a disposition statement must be provided on the company's letterhead with a copy of the scrap receipt prior to final inspection and for the issuance of a Certificate of Compliance.
Browse
Permits in Dutchess County, NYHVAC / heating / cooling permitsGeneral contractor permitsOpen bids in Dutchess County
Other recent filings nearby
Dutchess County, NY- Sep 21Sign
92 E Main St · Village of Wappingers Falls
- Sep 21OPERATING PERMIT
1576 Route 9 · Village of Wappingers Falls
- Sep 21HVAC
2 Convent Ave · Village of Wappingers Falls
- Sep 21POOL
22 Liss Rd · Village of Wappingers Falls