Work described
From the filingEV Charging Station- Electrical installation- AJI Electrical Solutions Inc. installing a Ford Charge Station Pro EV Charging System 80 AMP Wallbox in accordance with the manufacturer's installation instructions and specifications. An electrical inspection with certificate is required for the final inspection and issuance of a Certificate of Compliance.