Work described
From the filinghardwire ChargePoint Home Flex EVSE mounted to the exterior wall of the house, set to 48 amps.; install 3/4" EMT and pulling #6 THHN/THWN-2 from the existing 200 amp. panel to the EVSE. We will install a 60 amp breaker in the panel to protect the EVSE. This EVSE will also have load management to protect the EVSE from overloading the 200 amp. service; the charger has built-in GFCI protection
Browse
Permits in Fairfield County, CTGeneral contractor permitsOpen bids in Fairfield County
Other recent filings nearby
Fairfield County, CT- Aug 7Residential Reno (No Footprint Change)
119 STAPLES ROAD, Easton, CT 06612 · Easton
- Aug 7Mechanical Permit
49 FLAT ROCK ROAD, Easton, CT 06612 · Easton
- Aug 7Plumbing - Fire Suppression
484 East Main St Bridgeport CT 06608 · Bridgeport
- Aug 7Plumbing - General
449 Birmingham St Bridgeport CT 06606 · Bridgeport