Work described
From the filingREMODEL 1ST FLOOR POWDER ROOM TO INCLUDE NEW TILE FLOOR, TOILET, SINK, FAUCET AND WALL HUNG VANITY. REMOVE EXISTING WOOD FLOOR IN ENTRY HALL AND INSTALL NEW TILE FLOOR. INSTALL NEW STACK WASHER/DRYER IN 2ND FLOOR BEDROOM CLOSET. FOR THE LEVEL II ALTERATIONS TO BATHROOM APART OF EXISTING DWELLING UNIT. ALTERATIONS TO INCLUDE TILE WORK, DIRECT REPLACEMENT OF VANITY, WATER CLOSET, AND SHOWER BODY IN BATHROOMS WITH ALL OTHER WORK AS SHOWN PER PLANS. WORK TO INCLUDE FLOOR WORK. WASHER AND DRYER TO BE REPLACED. ALL WORK TO BE DONE PER APPROVED PLANS. FIXTURES AND APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS' SPECIFICATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. NO STRUCTURAL WORK ASSOCIATED WITH SCOPE OF WORK. SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL AND PLUMBING WORK
Browse
Permits in Westchester County, NYGeneral contractor permitsElectrical permitsOpen bids in Westchester County
Other recent filings nearby
Westchester County, NY- Sep 22Rock Removal
321 LOCUST AVE · City of Rye
- Sep 22Rock Removal
761 FOREST AVE · City of Rye
- Sep 22BUILDING PERMIT REVISION
27 JOYCE RD · Greenburgh
- Sep 21ROOF
2727 EVERGREEN ST · Town of Yorktown