Work described
From the filingThe proposed work consists of repairs to the damaged sections of the dam to restore the stability and functionality of the dam, including replacing the headwall gates and repairing the deteriorated spillways. The proposed work is to take place exclusively on the dam structures and an upland staging area in the existing parking lot of the site will be temporarily used during construction.