Work described
From the filingInstall 60 amp 120/240vac subpanel next to existing main panel. Move dryer circuit from the main panel and into sub panel and use it's breaker space to feed the sub panel. Out of the sub panel, Install 20a 240vac circuit outside to mini split inverter type air source heat pump. Include local disconnect, 120vac 15a service receptacle and wiring to new unit.
Browse
Permits in Fairfield County, CTElectrical permitsHVAC / heating / cooling permitsOpen bids in Fairfield County
Other recent filings nearby
Fairfield County, CT- Aug 14HVAC
18 Lyons Plain Road · Town of Weston
- Aug 13Roofing Permit
72 KNAPP STREET, Easton, CT 06612 · Easton
- Aug 13Roofing Permit
22 SOUNDVIEW DRIVE, Easton, CT 06612 · Easton
- Aug 13Plumbing Permit Sub-Contractor
32 FLAT ROCK ROAD, Easton, CT 06612 · Easton