Work described
From the filinginstalling radiant floor. I have 8 mill barrier first then 1.5 inch foam board Rated R 7.5. taping all seams on foam board. installing 5 inch tall R 7.5 foam board around inside perimeter. concrete will be 6 inch thick I and installing Pex 5/8 .070 Smart Wall Tubing w/ O2 Barrier. using plastic staples. This will be two zones and there will be 3 loops per zone each loop is about 245 FT. See diagram.
Browse
Permits in Hartford County, CTHVAC / heating / cooling permitsGeneral contractor permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Sep 6Plumbing Permit
169 RICHARD ST, Newington, CT 06111 · Newington
- Sep 6Electrical Permit
38 EASTGATE LA, ENFIELD, CT 06082 · Enfield
- Sep 6Building Permit
67 SUMMER ST, Bristol, CT 06010 · Bristol
- Sep 6Building Permit
84 FOX HOLLOW LA, Bristol, CT 06010 · Bristol