Work described
From the filingInterior and exterior removals only in preparation for future work to be done on a separate permit as per plans submitted. Work to include: Interior removal of non-historic elements. Removal of any residual flooring down to subfloor, remove (pull or pound) all associated fasteners/nails to prep for new finishes. De-nail and clean as needed all interior framing members to accept new finishes. Remove any residual electrical, plumbing lines. Basement excavation. Minor repairs to interior framing members where rotted. *** Digeplan *** *** Attached Asbestos Survey *** <div><br></div><div>*** The contractor is responsible that all areas of the structure within the scope of work having identified or presumed ACM must only be disturbed by a licensed NYSDOL asbestos contractor and the asbestos clearance letter must be provided to the building inspector prior to final inspection. *** </div><div>*** Separate DPW approval and permit required for any work to be done on the City of Buffalo right-of-way. *** </div><div><div><br></div><div><br></div><div><br></div></div>
Browse
Permits in Erie County, NYDemolition permitsGeneral contractor permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Jul 28Interior Demolition / Tearout
129 Elmwood, Buffalo · Buffalo
- Jul 28Building Repair
24 Brinton, Buffalo · Buffalo
- Jul 28Building Repair
840 Richmond, Buffalo · Buffalo
- Jul 28Building Repair
501 Niagara, Buffalo · Buffalo