Work described
From the filing( TEAR OUT PERMIT ONLY IN PREPARATION FOR FUTURE WORK TO BE DONE ON A SEPARATE PERMIT ) <div>Removal of Existing Finishes in the Crew Line Bathroom & Locker Room. Existing MEP's will be removed as per the drawings. Any MEP's to remain will be made safe as per code. Sprinkler System Branch Lines to be removed to Main connections and all heads to be removed within the space. Existing Floor to be removed for removal of existing underground sanitary. *** Digeplan ***</div><div><br></div><div>*** Attached Neg. Asbestos Survey *** </div>
Browse
Permits in Erie County, NYDemolition permitsFire suppression / sprinkler permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Jul 28Interior Demolition / Tearout
129 Elmwood, Buffalo · Buffalo
- Jul 28Building Repair
24 Brinton, Buffalo · Buffalo
- Jul 28Building Repair
840 Richmond, Buffalo · Buffalo
- Jul 28Building Repair
501 Niagara, Buffalo · Buffalo