Townline
Building permit · Erie County, NY

Building Repair

5 Hazelwood, BuffaloBuffaloGeneral contractorInsulation

Work described

From the filing

SCOPE OF WORK: INSTALL INSULATION AT EXTERIOR WALLS AS REQUIRED, SHEETROCK, VINYL FLOORING, TILE FINISHES AT KITCHEN AND BATHROOM, PAINTING, DECORATION, AND KITCHEN/BATHROOM REFURBISHMENT.NO PLUMBING OR ELECTRICAL WORK IS INCLUDED UNDER THIS PERMIT. SEPARATE PERMITS SHALL BE OBTAINED BY LICENSED PLUMBING AND ELECTRICAL CONTRACTORS IF REQUIRED.ASBESTOS REPORT, OWNER'S AFFIDAVIT, AND WORKERS' COMPENSATION EXEMPTION CERTIFICATE ATTACHED.IDENTIFIED ACM FLOORING AND TILE MORTAR SHALL REMAIN UNDISTURBED AND PROTECTED. NEW FLOORING/TILE SHALL BE INSTALLED OVER EXISTING ACM MATERIALS. NO CUTTING, DRILLING, GRINDING, SANDING, OR OTHER ACTIVITIES THAT MAY DISTURB ACM SHALL BE PERMITTED.    ***MEPS TO BID ***   ***ASBESTOS SURVEY ATTACHED ***

Browse

Permits in Erie County, NYGeneral contractor permitsInsulation permitsOpen bids in Erie County

Other recent filings nearby

Erie County, NY
Building Repair — 5 Hazelwood, Buffalo — Townline