Work described
From the filingWATER SERVICE EXPLORITORY Work will include: * Excavating at the existing curb stop located within the concrete driveway apron. * Exposing the water service piping on both sides of the curb stop. * Verifying the material, size, and condition of the existing water service. * Disconnecting the service after the curb stop and verifying available water pressure and volume at that location. * If adequate pressure and volume are available at the curb stop, we will determine that the restriction is located between the curb stop and the home. We will then proceed with replacing the water service from the curb stop to the basement. * If limited or inadequate pressure and volume are present at the curb stop, we will proceed with replacing the entire water service from the municipal water main to the basement meter location.
Browse
Permits in Erie County, NYPlumbing / piping permitsGeneral contractor permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Sep 11Building Repair
259 Newburgh, Buffalo · Buffalo
- Sep 11Building Repair
65 Parkridge, Buffalo · Buffalo
- Sep 11Building Repair
156 Fourteenth, Buffalo · Buffalo
- Sep 11Building Repair
251 Maryland, Buffalo · Buffalo