Townline
Building permit · Erie County, NY

Plumbing

118 Parkside Ct, BuffaloBuffaloPlumbing / pipingGeneral contractor

Work described

From the filing

The basement floor will be sawcut 12” from the partial wall on the side of the basement to the sump pump pit 40’ to the sump pump pit. The concrete will then be broken up and removed. The existing floor drain will be removed. A trench will be excavated 12” deep and all removed debris will be hauled away. A base layer of crushed stone will be installed, followed by 4’” pvc pipe and fittings. The line will discharge into the existing sump pump basin. Access points will be placed at each 90 degree turn in the system. A spacer will be installed to create a 1/4” gap in between the wall and floor. The remaining trench will be backfilled with crushed stone and the concrete will be replaced which will not match the surrounding concrete.

Browse

Permits in Erie County, NYPlumbing / piping permitsGeneral contractor permitsOpen bids in Erie County

Other recent filings nearby

Erie County, NY
Plumbing — 118 Parkside Ct, Buffalo — Townline