Townline
Building permit · Erie County, NY

Plumbing

4 Teresa, BuffaloBuffaloPlumbing / pipingPaving / asphalt / concrete

Work described

From the filing

In driveway we will saw cut a 3x5’ area over existing trap vent. Breaking concrete and hauling away spoils we will excavate down to sewer approximately 5’ deep. Removing trap and up to 5’ of sewer. Installing new pvc trap and up to 5’ of sewer. Attaching onto existing line at each end of repair. We will backfill with fresh stone, vibe tamp to grade. Cellino plumbing is not responsible for final concrete repair. Will be inspected by local code enforcement. Includes parts and permit.

Browse

Permits in Erie County, NYPlumbing / piping permitsPaving / asphalt / concrete permitsOpen bids in Erie County

Other recent filings nearby

Erie County, NY