Work described
From the filing• Install gas line from meter to pipe out of ground, heater side hook up with shut off. • Meter side covert 1” to ¾-3/4 tee, Run along house blk pipe to underground gas pipe. • Heater side -hook up to pool heater.
Browse
Permits in Erie County, NYPlumbing / piping permitsPool installation / service permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Aug 27Use Permit
490 Prospect, Buffalo · Buffalo
- Aug 27Interior Demolition / Tearout
554 Shirley, Buffalo · Buffalo
- Aug 27Swimming Pool
133 Shenandoah, Buffalo · Buffalo
- Aug 27Building Repair
116 Fisher, Buffalo · Buffalo