Work described
From the filingWe will install 4" PVC perforated drainage pipe along all walls as indicated on attached job sketch. We will install the 1 1/2 PVC discharge needed to run from the sump pump location to the front of home. We will also be installing a sump pump into the basement of the home as well.
Browse
Permits in Erie County, NYPlumbing / piping permitsGeneral contractor permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Jul 28Interior Demolition / Tearout
129 Elmwood, Buffalo · Buffalo
- Jul 28Building Repair
24 Brinton, Buffalo · Buffalo
- Jul 28Building Repair
840 Richmond, Buffalo · Buffalo
- Jul 28Building Repair
501 Niagara, Buffalo · Buffalo