Work described
From the filingThis quote includes all permits and fees, but does not include any final landscaping, grass, or grading repair. A trench approximately 3’ wide, by 6’ long, by 7’ deep will be excavated from the front foundation wall, to the sidewalk. The exposed piping will then be removed. A camera inspection will then be performed on the remaining line to assess its condition, and if any further repairs are recommended they will be quoted at this time. Otherwise, a new section of pvc sewer lines, house trap, and forward sweep cleanout will be installed. Following inspection, the repair will be bedded in crushed stone, and all excavated debris will be backfilled. A mound will be left to allow the ground to settle naturally.
Browse
Permits in Erie County, NYPlumbing / piping permitsExcavation / sitework / septic permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Sep 12Plumbing
313 Landon, Buffalo · Buffalo
- Sep 11Building Repair
259 Newburgh, Buffalo · Buffalo
- Sep 11Building Repair
65 Parkridge, Buffalo · Buffalo
- Sep 11Building Repair
156 Fourteenth, Buffalo · Buffalo