Work described
From the filingNail salon ventilation system for two stations providing a minimum of 50 CFM airflow at both exhaust inlet openings. Ventilation recovery unit providing 118 CFM of heated intake air for replacement of nail station exhaust air. Air exhaust and recovery are being handled through a rooftop exhaust b-vent pipe with a vent cap. The air intake pipe is connected to the VRU. The roof connection has a curb cut that has been sealed and insulated by the building owners roofing company.
Browse
Permits in Erie County, NYHVAC / heating / cooling permitsInsulation permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Sep 11Building Repair
259 Newburgh, Buffalo · Buffalo
- Sep 11Building Repair
65 Parkridge, Buffalo · Buffalo
- Sep 11Building Repair
156 Fourteenth, Buffalo · Buffalo
- Sep 11Building Repair
251 Maryland, Buffalo · Buffalo