Plumbing

316 Norwalk, BuffaloBuffaloPlumbing / pipingExcavation / sitework / septic

Work described

From the filing

The floor surrounding the floor drain and area in between the foundation wall and the drain will be broken up and removed. A hole will then be excavated large enough to accommodate a sump pump basin. The floor drain trap will be cut out and capped, and a plastic sump pump basin will be installed. The trench will be backfilled with crushed stone, and the concrete will be replaced. A Zoeller 1/3hp sump pump will be installed along with a 1.5” pvc discharge. The discharge will exit the rear corner of the house and tie into the rain conductor. A dedicated circuit with wiring and single receptacle will be installed for the pump to plug into. A manual gate valve will be installed on the laundry tub drain line for emergency use. plus water-powered backup w sump install -- Only valid with water pressure and volume test to confirm minimums are met.

Browse

Permits in Erie County, NYPlumbing / piping permitsExcavation / sitework / septic permitsOpen bids in Erie County

Other recent filings nearby

Erie County, NY
Plumbing — 316 Norwalk, Buffalo — Townline