Work described
From the filingThe proposed work consists of the installation of organic waste processing equipment within an existing pre-engineered metal building located at 375 Route 1&9 South. There will be no change to the building's exterior footprint or height. The project will not result in the addition of any new building space. No sitework or modification to building setbacks or parking requirements are proposed. The scope includes demolition of existing non-load-bearing partitions, the installation of floor drains, sump, process piping, ventilation fan, and electric system for power and controls for new organic waste processing equipment. The project will include instillation partition sheeting, repairs to existing walls and floors, and replacement of floor slabs after underground pipe installation. Two new egress doors are proposed to bring the area of the proposed project into compliance with the New Jersey Uniform Construction Code.
Browse
Permits in Hudson County, NJPlumbing / piping permitsDemolition permitsOpen bids in Hudson County
Other recent filings nearby
Hudson County, NJ- Nov 10MUA - Sewer Application
274 4TH ST Jersey City NJ 07302 · Jersey City
- Nov 10Plumbing Subcode Technical Section - Minor Work
75 LINDEN AVE APT 2 Jersey City NJ 07305 · Jersey City
- Nov 10Plumbing Subcode Technical Section - Minor Work
2224 JOHN F KENNEDY BLVD APT 1 Jersey City NJ 07304 · Jersey City
- Nov 10Plumbing Subcode Technical Section
208 CENTRAL AVE Jersey City NJ 07307 · Jersey City