Work described
From the filing(1) cutting concrete slab to lay below-grade waste lines and ties-ins; (2) roughing-in waste, vent, and supply water lines for a new shower (including setting shower base/pan), toilet, and vanity sink; (3) backfilling, concrete re-pour, and rough testing of all waste/vent lines; (4) setting final fixtures (toilet, sink, shower trim); and (5) plumbing and tying in a new hydronic kickspace/baseboard heater to the existing heating system.
Browse
Permits in New Haven County, CTPlumbing / piping permitsGeneral contractor permitsOpen bids in New Haven County
Other recent filings nearby
New Haven County, CT- Nov 13Plumbing Permit
200 PEARL ST, Seymour, CT 06483 · Seymour
- Nov 13Building Permit
30 PROGRESS AVE, Seymour, CT 06483 · Seymour
- Nov 13WPCA Sewer Connection Permit
1140 St. Andrews Drive, Oxford, CT 06478 · Oxford
- Nov 13WPCA Sewer Connection Permit
1142 St. Andres Drive, Oxford, CT 06478 · Oxford