Work described
From the filingInstallation of a new electrical service gateway associated with the installation of a solar photovoltaic (PV) system and battery energy storage system (BESS). Electrical work includes the installation and connection of the service gateway, modification and/or reconfiguration of existing electrical service equipment as required, and installation of all associated electrical wiring, conduits, feeders, conductors, and connections necessary for the proper integration of the solar PV system and battery storage system with the existing electrical service. Scope of work also includes all required wiring and electrical connections between the battery storage system, inverter, service gateway, and associated equipment, including the necessary connections for battery charging, discharging, and backup power functionality, as applicable. All work to be performed in accordance with applicable NEC requirements, New York State Electrical Code, and local City of Yonkers electrical requirements.
Browse
Permits in Westchester County, NYElectrical permitsSolar permitsOpen bids in Westchester County
Other recent filings nearby
Westchester County, NY- Nov 23ACCESSORY STRUCTURE
800 EAST MAIN ST · Town of Yorktown
- Nov 23PLUMBING
2126 WHITE BIRCH DR. · Town of Yorktown
- Nov 23HVAC
1786 BALDWIN RD · Town of Yorktown
- Nov 23ELECTRICAL
25 WHITMAN RD · Town of Yorktown