Work described
From the filingRemodel hall bathroom and master bathroom - new tubs, faucets, vanities, light fixtures, switches, outlets, fans, detra heat flooring, tile, repair drywall, paint. Floorplan stays the same in both bathrooms. I'd like this to be a blanket permit for the plumber and electrician. Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed 1.Separate Electrical, Plumbing, and Mechanical permits may need to be applied for. If work in these areas are being updated/repaired, or altered. IRC R105.1 2.Provide Smoke and CO Detectors per IRC for alterations, repairs and additions. IRC R314.2.2, R315.2.2 3.. Provide safety glazing as required per IRC. IRC R308.4.1 through R308.4.7 @ bathroom wall if window is within 60" horizontally of tub, shower and within 60" vertically of the walking or standing surface. IRC R308.4.5 4.11When shower liners are water tight by materials from IRC P2709.2 and before tile is installed. A shower pan test will be required before membrane are concealed. This test is to follow all requirements of IRC P2503.6
Browse
Permits in Hartford County, CTGeneral contractor permitsElectrical permitsOpen bids in Hartford County