Townline
Building permit · Erie County, NY

Plumbing

607 Ashland, BuffaloBuffaloPlumbing / pipingPaving / asphalt / concrete

Work described

From the filing

Saw cut bust and remove driveway pads. Cart concrete from site, trench down at house where sewer exits, (right front) continue trenching all the way out to city main, approx 40 feet. Cart all spoils from site. Remove old damaged trap and compromised sewer line. Replace with new PVC. Install new check valve onto sewer line to prevent sewage water from backing up when city sewer main is breached or full. Will install trap, riser and clean out. Will connect to a workable piece of pipe before main near tap. After inspection by City of Buffalo, backfill trench with stone

Browse

Permits in Erie County, NYPlumbing / piping permitsPaving / asphalt / concrete permitsOpen bids in Erie County

Other recent filings nearby

Erie County, NY
  • Nov 2
    Sign

    572 Division South, Buffalo · Buffalo

  • Nov 2
    Building Repair

    127 Ramsdell, Buffalo · Buffalo

  • Nov 2
    Building Repair

    97 Martha, Buffalo · Buffalo

  • Nov 2
    Building Repair

    176 Elk, Buffalo · Buffalo