Work described
From the filingSaw cut bust and remove driveway pads. Cart concrete from site, trench down at house where sewer exits, (right front) continue trenching all the way out to city main, approx 40 feet. Cart all spoils from site. Remove old damaged trap and compromised sewer line. Replace with new PVC. Install new check valve onto sewer line to prevent sewage water from backing up when city sewer main is breached or full. Will install trap, riser and clean out. Will connect to a workable piece of pipe before main near tap. After inspection by City of Buffalo, backfill trench with stone
Browse
Permits in Erie County, NYPlumbing / piping permitsPaving / asphalt / concrete permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Nov 2Sign
572 Division South, Buffalo · Buffalo
- Nov 2Building Repair
127 Ramsdell, Buffalo · Buffalo
- Nov 2Building Repair
97 Martha, Buffalo · Buffalo
- Nov 2Building Repair
176 Elk, Buffalo · Buffalo