Townline
Building permit · Erie County, NY

Building Repair

39 Summit, BuffaloBuffaloGeneral contractorPool installation / service

Work described

From the filing

Remove existing inground pool within rear yard and clean fill excavated area to then grade and level to final grade for proper drainage not to collect standing water or cause neighboring or adjacent properties to become a receptacle for the aforementioned drainage. Future land use open space.<div><br></div><div>*** All separate required electrical or plumbing permits must be applied for as needed per permit. ***&nbsp;</div>

Browse

Permits in Erie County, NYGeneral contractor permitsPool installation / service permitsOpen bids in Erie County

Other recent filings nearby

Erie County, NY
  • Oct 29
    Sign

    881 Broadway, Buffalo · Buffalo

  • Oct 29
    Building Repair

    408 Porter, Buffalo · Buffalo

  • Oct 29
    Building Repair

    54 Freund, Buffalo · Buffalo

  • Oct 29
    Building Repair (Plans)

    539 Utica East, Buffalo · Buffalo

Building Repair — 39 Summit, Buffalo — Townline