Work described
From the filingMAIN DRAIN AND FRESH AIR INLET - Approved plumbing repair work per EZ Permit Standard for Plumbing - For the replacement of underground building sewer utilizing the pipe bursting method, limited to piping 6" in diameter or less and not extending past the curb line. Recorded video camera survey Pre-Installation and Post Installation inspection required. -
Browse
Permits in Philadelphia County, PAPlumbing / piping permitsGeneral contractor permitsOpen bids in Philadelphia County
Other recent filings nearby
Philadelphia County, PA- Oct 31Residential Building — Addition and/or Alteration
2028 DELANCEY PL · Philadelphia
- Oct 31Plumbing — Alterations
2833 N VAN PELT ST · Philadelphia
- Oct 31Plumbing — Alterations
2324 CEDAR ST · Philadelphia
- Oct 31Plumbing — Alterations
4601 TACONY ST · Philadelphia