Work described
From the filingSupply and install a single phase 200amp meter/panel combo. (the meter/panel combo will allow for future interior panel install via a feed through lug at the bottom of the panel) Supply and install a 4/0 SEU riser and weather head to the point of attachment. Supply and install 2 grounding electrodes with #4 bare copper wire for ground bond. Supply and install 4 20amp GFI receptacles below the panel each GFI receptacle will ne dedicated 20amp circuit with a single pole 20amp arc-fault circuit breaker