Work described
From the filingSupply and install single phase 200amp meter/panel combo. (The meter/panel combo will allow for future interior panel install via a feed through lug at the bottom of the panel. Supply and install a 4/0 SEU riser and weather head to the point of attachment. Supply and install (2) grounding electrodes with #4 bare copper wire for ground bond. Supply and install (4) 20amp GFI receptacles below the panel. Each GFI receptacle will be a dedicated 20amp circuit with a single pole 20amp arc-fault circuit breaker.