Work described
From the filingFurnish and install (1) dedicated 60A, 240V, 2-pole branch circuit fed from the existing interior electrical distribution panel to the garage. Mount and hardwire (1) Tesla Wall Connector (EVSE) inside the garage on the wall between the overhead garage doors (48A continuous output rating). Complete all wiring, terminations, ground bonding, and operational commissioning. Existing electrical service equipment remains unchanged.
Browse
Permits in Hartford County, CTGeneral contractor permitsElectrical permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Nov 13Plumbing Permit
60 DUNFEY LN, Windsor, CT 06095 · Windsor
- Nov 13Plumbing Permit
494 WINDSOR AVE, Windsor, CT 06095 · Windsor
- Nov 13HVAC Permit
1031 PLYMOUTH ST, Windsor, CT 06095 · Windsor
- Nov 13HVAC Permit
11 TANGLEWOOD DR, Windsor, CT 06095 · Windsor