Work described
From the filinginstallation of a Heat N Glo direct vent gas fireplace insert into existing masonry fireplace with full chimney reline using UL listed liner kit Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed. 1. Liner shall be installed per manufacturer spec. Typically insulation is required. 2. Upload liner install photos. 3.. Installation shall comply with the 2022 CT State Building Code and the manufacturers specifications. M1401.1 4. C/O detection shall be installed/verified IRC 315.2.2
Browse
Permits in Hartford County, CTPlumbing / piping permitsInsulation permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Nov 20Excavation - Driveway/Sidewalk
29 NORTH LIBERTY ST · Town of Southington
- Nov 20HVAC
295-05 LANING ST · Town of Southington
- Nov 20Electrical
75 MAIN ST · Town of Southington
- Nov 20Photovoltaic Solar
10 MEEKER RD · Town of Southington