Townline
Building permit · Burlington County, NJ

Construction Permit - B

110 MT HOLLY BY PASSLumbertonGeneral contractorInsulation

Work described

From the filing

REROOFING OF 3 BUILDINGS APPROX. 249,400 SF TOTAL(110: 85,100 SF 120: 79,500 SF 130: 84,800 SF) REMOVE EXISTING EPDM MEMBRANE, FLASHING & ANCILLARY ITEMS TO SOUND SUBSTRATE. REMOVE/REPLACE APPROX. 12,000 SF WET POLYISO INSULATION PER IR SCAN, REPAIR DAMAGED DECK AS NEEDED. INSTALL GAF EVERGUARD 60 MIL TPO MECHANICALLY ATTACHED IN-SEAM (RHINOBOND AT PERIMETER) HOT-AIR WELDED SEAMS ASCE 7-24/ FM FASTENING/ NEW EDGE METAL, COPING, .040 SLIP METAL COUNTERFLASHING, 24 GA SCUPPERS, PENETRATION FLASHINGS. BLG 120: FLASH 13 DRAINS & 13 OVERFLOW SCUPPERS. MIN 750 LF TPO WALKWAY PADS, PAVERS AT ROOF HATCHES, GAF 20 YEARS NDL WARRANTY

Browse

Permits in Burlington County, NJGeneral contractor permitsInsulation permitsOpen bids in Burlington County

Other recent filings nearby

Burlington County, NJ
Construction Permit - B — 110 MT HOLLY BY PASS — Townline