Work described
From the filingRemove pex connected to water heater and install copper at least 18 inches from the tank. From here I will use high heat furnace cement on the exhaust termination. Drip tube will be installed with appropriate material and brought to proper distance from the floor. Next the gas line will be hard piped. Estimate also includes installing a hardwire smoke and Co and to install a p trap/silicolne the sink upstairs.
Browse
Permits in Erie County, NYPlumbing / piping permitsHVAC / heating / cooling permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Nov 19Building Repair
1900 Kenmore, Buffalo · Buffalo
- Nov 19Building Repair
171 Esser, Buffalo · Buffalo
- Nov 19Building Repair
96 Carlyle, Buffalo · Buffalo
- Nov 19Building Repair
27 Cornwall, Buffalo · Buffalo