Townline
Building permit · New Haven County, CT

Building - Electrical (Stand Alone work)

130 ORCUTT DR GUILFORD ConnecticutGuilfordGeneral contractorElectrical

Work described

From the filing

Hardwiring a Rivian Wall Charger EVSE on the right interior wall of the garage, set to 40 amps (9.6 kW). Installing a 50-amp breaker at the existing 200-amp GE main breaker panel to protect the EVSE. To make room in the main panel, install a small subpanel next to the main panel, fed with 6/3 MC cable from a 50-amp breaker, and move a few existing circuits to it. Pulling #6 MC cable from the main breaker panel through the unfinished basement to the garage, about 30ft. Once in the garage, transitioning to 3/4-inch EMT and pulling #6 THHN/THWN-2 copper conductors through. About 20 to 25 ft of conduit used to reach the EVSE. Also installing a customer-supplied Generac load management device to protect the EV charger from overloading the backup generator. The charger has built-in GFCI protection

Browse

Permits in New Haven County, CTGeneral contractor permitsElectrical permitsOpen bids in New Haven County

Other recent filings nearby

New Haven County, CT
Building - Electrical (Stand Alone work) — 130 ORCUTT DR GUILFORD Connecticut — Townline