Townline
Building permit · New London County, CT

Residential - Remodel

42-A NEW LONDON RD MYSTIC Groton CT 06355GrotonGeneral contractorDemolition

Work described

From the filing

BATHROOM: Demolition: 1. Remove shower/bathtubs, toilets, vanity cabinets, sinks, electrical devices, hardware, etc. 2. Remove door casing, base molding, & floor tile as necessary. 3. Remove all wall & ceiling surfaces as necessary. 4. Remove framing & insulation as necessary. Construction: 1. Construct new 3’ x 5’ shower area per plan. 2. Install nailers for future grab bars and new sheetrock installation as necessary. Rough Plumbing: 1. Relocate water supplies and drains per plan as necessary. 2. Install one (1) new M-Core 3/6 Port Shower Valve per manufacturer’s specifications (PMS). 3. Install new drain assemblies for bathtub & vanity as necessary. Rough Electrical: 1. Install new wiring for lights, fan/lights, mirrors, switches, & outlets per plan/homeowner. a. Three (3) 4” LED Recessed Lights per homeowner. 2. Install one (1) Panasonic (or equivalent) (FV-0511VQC1) Whisper Sense 50/80/110 CFM Ceiling Mount Fan w/ Dual Motion & Humidity Sensor PMS. a. Vent to exterior and install vent cover. Insulation: 1. Install R-21 (or higher) Faced Batt Insulation in wall & ceiling cavities as necessary. Bathtub Construction: 1. Install Duravit No.1 Alcove Bathtub. a. 60 " x 32 1/8 ", White Gloss. 2. Install tile for shower walls & bathroom floor. a. Shower wall & Bathroom Floor Tile TBD. b. DT Tile is responsible for all setting materials. Drywall: 1. Install ½” Moisture Resistant Sheetrock to walls and ceiling as necessary. a. Apply one coat of joint compound and tape. b. Apply two topcoats of joint compound. c. Sand all surfaces smooth and prime w/ Coronado Final Touch white latex paint. d. Apply additional coat Coronado Final Touch paint to ceilings. Interior Trim: 1. Install PFJ door & window casing and PFJ base molding to match existing. Interior Finishes: 1. Install new vanity cabinet & vanity top, faucet. 2. Install Moen Shower Valve Trim Kit PMS. 3. Install new p-trap drain kits as necessary. Interior Electrical Finishes: 1. Recessed lights to be dimmable. 2. Install new outlets per code. Style & color TBD. 3. Install new Owner Provided surface mount light fixtures as necessary. 4. Install all cover plates or other electrical accessories as necessary.

Browse

Permits in New London County, CTGeneral contractor permitsDemolition permitsOpen bids in New London County

Other recent filings nearby

New London County, CT