Scope
HVAC upgrades require a 5% bid bond, 100% performance and labor/material bond, applicable Connecticut prevailing-wage compliance, and specified insurance including a $5,000,000 umbrella policy. The non-mandatory pre-bid site meeting is August 25, 2026 at 3:00 PM ET; submit a sealed envelope marked “BID #2027-05” to the Purchasing Department by September 17, 2026 at 10:00 AM ET. The only listed document is a document access page, and no budget is listed.
Requirements
From the notice to bidders- Insurance
- Required
- Bonding
- Required
- Prevailing wage
- Required
- Pre-bid site meeting and sign-in
- Optional
- Permits
- Required
- Bid form and pricing format
- Required
- Pre-bid site meeting
- Optional
- DAS contractor prequalification
- Verify
- Required bid checklist documents
- Required
- Signed bid form and pricing
- Required
Trades called for
1 matchedHVAC / heating / cooling
Browse
Other open bids nearby
Fairfield County, CT- Aug 21Pump Base and Slide Rail Upgrades at Two (2) Pump StationsTown of Fairfield
- Aug 21Sewer Pump Station 10 Force Main ReplacementTown of Westport
- Aug 21PM2026-4 Paving At Various Locations (LOCIP)City of Norwalk
- Aug 24Parking Garage Repair and SealingTown of Greenwich