Disconnect and remove equipment and cabling from existing equipment panel Install new NEMA 3R 20 inch by 20 inch by 6 inch weatherproof, gasketed hinged door and equipment mounting back plate, equipment panel on main satellite with new galvanized mounting hardware. Ground and bond panel. Excavate a minimum of 24 inch deep trench from primary to secondary satellite dishes Extend existing 2 inch PVC conduit from below grade to primary satellite equipment panel, install rigid galvanized 90° bend and stub 18 inches above grade to prevent lawn maintenance damage, continue with armored liquid tight flexible conduit into new equipment panel. Install new 1 - 1/2 inch rigid PVC communication conduit between primary and secondary satellite dishes, install rigid galvanized 90° bend and stub 18 inches above grade to prevent lawn maintenance damage, continued with armored liquid tight flexible conduit into new equipment panel and provide cast weatherhead at secondary satellite Install new three-quarter inch rigid PVC power conduit between primary and secondary satellite dishes, install rigid galvanized, 90° bend and stub 18 inches above grade to prevent lawn maintenance damage continue with armored liquid type flexible conduit into existing weatherproof box and into new equipment pane, reuse existing circuit from secondary conduit to feed power to primary satellite equipment panel, provide new quadplex 120 volt 20 amp receptacles in primary satellite equipment panel. Install individual conductors for phase, neutral and equipment grounding. Place new conduits inside concrete form and pour concrete around conduit at primary and secondary satellite to prevent movement. Install two braided mule pull tapes in 2 inch and 1 x 1/2 inch communication conduits for current and future fiber optic cable pulls.
Locked on the free plan
ProPermit record
- Permit no.
- ELEC25-9650976
- Municipality
- Buffalo
- Block / lot
- 1106000003001000
- Trade
- Electrical
- Work type
- Electrical