Permit

36 FEATHER LN GUILFORD Connecticut 06437

In ReviewGuilford · General contractor · filed Aug 20+1 more at this address

Hardwiring a ChargePoint Home Flex EVSE mounted inside the garage, set to 48 amps. Pulling #6 MC cable from the existing 200-amp panel to the garage. Changing to 3/4-inch EMT inside the garage and pulling #6 THHN/THWN-2 through the conduit to the EVSE. We will install a 60-amp breaker in the panel to protect the EVSE. Also, installing a load-shedding device to protect the EV charger from overloading the 200 A service. The charger has built-in GFCI protection

Valuation
$1.9K
Filed
Aug 20, 2026
Lot
W0100001

Locked on the free plan

Pro

Permit record

Permit no.
ELECTRIC-2608-000074
Municipality
Guilford
Block / lot
W0100001
Trade
General contractor
Work type
Building - Electrical (Stand Alone work)

At this property

1 other permit
History