65 PORRIELLO DR

IssuedTown of Southington · General contractor · filed Jul 31

***MIKE IS WORKING ON THIS**** Shrink 4 spots in the panel with 2 - Homeline 2020. Install a 50A 2-pole homeline circuit breaker in the main panel. Route the circuit from the basement along the unfinished ceiling, up into the garage, and terminate at the interior back wall. Ensure cables are neatly supported along the unfinished ceiling run. It is approx. 30' Mount the AmpUp Artemis unit on the interior back wall next to the existing charger and hardwire the connection. C/A fee included

Valuation
$1.5K
Filed
Jul 31, 2026
Lot
0550980006

Locked on the free plan

Pro

Permit record

Permit no.
E-26-48343
Municipality
Town of Southington
Block / lot
0550980006
Trade
General contractor
Work type
EV Charger

Property

Assessor record
Type
Single Family
Built
2011
Living area
2,621 sq ft
Appraised
$510,730
Last sold
Aug 2011