Wiring of (27) roof mounted solar panels (11.34 kw) and (4) Tesla Energy Storage system (54 kwh) and 1 EV charger and concrete pad Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. Please review our comments listed below. Conditions are subjected to field inspections. 1. NO STRUCTURAL UPGRADE IS REQUIRED- on the existing structure for installation of the array(s) as proposed, per provided engineer’s evaluation. 2. Roof access and pathways are to be provided per ’21 IRC section R324.6 of the ’22 CT State Building Code. 3. PV Array occupancy not more than 33% of plan view total roof area, shall have a clear setback of not less than 18 inches on both sides of horizontal ridge. IRC R324.6.2 4. ESS energy storage is to be located at minimum of 3 feet from an opening into home. IRC R328.4 5. Provide Smoke and CO Detectors per IRC for alterations, repairs and additions. IRC R314.2.2, R315.2.2
Locked on the free plan
ProPermit record
- Permit no.
- E-26-0414
- Municipality
- Simsbury
- Block / lot
- H05 403 021-A&5
- Trade
- Electrical
- Work type
- Electrical Wiring
Property
Assessor record- Type
- Residential
- Built
- 2023
- Living area
- 2,155 sq ft
- Appraised
- $523,500