The Ethel Walker School is undertaking a renovation to The Ferguson Theatre, to update the building finishes and add Air Conditioning. An initial partial release of the permit has been discussed regarding demolition only. Your revisions to the previously submitted building plans have been reviewed for compliance with the 2022 State of Connecticut Building Code. The revisions to the plans for the proposed work is approved based on the following conditions and is subject to field inspections: 1. Deferred submittals below are to be received prior to framing inspections. IBC 107.3.4.1 They are as follows: a. Canopy structural drawings b. TPO roof materials included fire classifications IBC 1505.1 c. TPO roof warranty prior to final inspection d. Information of roof deck insulation fasteners and fastener schedule. How will insulation resist wind speeds of area. IBC 1504.4 2. Intumescent paint manufacture and cut sheet is to be provided. IBC 3. Structural drawings S-201 and S-204 are to stamped by registered professional. IBC 107.1 4. Construction safeguards are to be in place throughout the duration of the project. IBC Chapter 33
Locked on the free plan
ProPermit record
- Permit no.
- B-26-0450
- Municipality
- Simsbury
- Block / lot
- D15 115 006
- Trade
- General contractor
- Work type
- Alteration/Renovation-Comml
Property
Assessor record- Type
- Commercial
- Built
- 2025
- Living area
- 24,264 sq ft
- Appraised
- $46,474,200
At this property
6 other permits- Plumbing / piping · Plumbing$12.8K · Aug 3
- General contractor · AC Replacement$5.4K · Aug 3
- Electrical · Electrical Wiring$30K · Jun 9