Installation of new outdoor service conductors for 200 AMPS (SEU). Installation of a new utility meter enclosure 200 AMPS. Installation of a new 200-AMP main service disconnector outdoor-rated panel. Installation of a new 200-AMP SER from the load side of the outside main service disconnect to the line side of the new circuit breaker panel inside. Installation of a new Square D Homeline 40/80 circuit main breaker panel, 200-AMPS. Installation of new plywood to mount the panel on. Installation of all new circuit breakers. New terminations to utility power will be completed by Nicholas Electric Corp. Installation of new porcelain with a 5/8 threaded rod supported to the house. Installation of new ground rods. Installation of a grounding electrode at the outside main service disconnect. Installation of a new grounding electrode to the water main and two new water clamps (bond line & load side of water utility meter). Installation of a whole-house surge protector. Installation of AFCI/GFCI Receptacle next to panel inside.
Locked on the free plan
ProPermit record
- Permit no.
- E-26-3062
- Municipality
- Village of Ossining
- Block / lot
- 90.09-5-19
- Trade
- Electrical
- Work type
- Electrical
Property
Assessor record- Type
- Single family