116 HARVEST LN
Water Distribution System (Hot & Cold) 2. Drainage & Waste System (DWV) Complete demolition and removal of existing accessible drainage lines. Installation of a brand-new PVC drainage and vent system tied to the main building drain. Kitchen: Rough-in for two (2) kitchen sinks. Rough-in for one (1) stove-top pot filler. Half Bath: Rough-in for a double vanity (two sinks). Rough-in for a standard bathtub. Rough-in for a toilet. Master Bath: Rough-in for a dedicated shower unit. Rough-in for a standalone soaking tub. Rough-in for a double vanity (two sinks). Basement Full Bath: Rough-in for a standard bathtub. Rough-in for a dedicated shower unit. Rough-in for a single bathroom sink. Rough-in for a toilet.Laundry Rooms, Rough-in for two (2) distinct laundry rooms (water lines, drain boxes, and vents). Gas Piping Systems Modify and repipe the existing gas line servicing the main furnace. Modify and repipe the existing gas line to service the Navien tankless water heater. Extend and run a new gas line branch to supply the additional furnace located in the attic space. Specialty Systems Repipe and modify the routing of the existing radon mitigation piping to accommodate the new structural layout.
Locked on the free plan
ProPermit record
- Permit no.
- P-26-0277
- Municipality
- City of Milford
- Block / lot
- 051 936 17 G
- Trade
- Plumbing / piping
- Work type
- Plumbing - R
Property
Assessor record- Type
- SINGLE FAM MDL-01
- Built
- 2016
- Living area
- 2,312 sq ft
- Appraised
- $497,050
- Last sold
- $420,000 · Jul 2018
At this property
7 other permits- General contractor · ZON - New Accessory StructureJul 20
- Security / fire alarm / low voltage · Fire Alarm and Detection - R$8K · Jul 1
- HVAC / heating / cooling · Mechanical - R$28.5K · Jun 25
- Electrical · Electrical - R$18K · Jun 25