440 WHEELERS FARMS RD
Locker rooms and Gym. Disconnect and remove three existing cooling VAV boxes not required Remove Return Air Sound Attenuator in conflict with demised wall Disconnect, cap, and removed existing supply air duct not required or wrong size Convert two existing cooling only pneumatic controlled VAV boxes to Delta Controls Install new cooling only VAV box with Delta Controls Two exhaust fans for the locker/bathrooms. One fan is connected to a new louver mounted on the West wall (rear parking lot), the other fan will tie into the existing exhaust riser. New ceiling supply, return, and exhaust grills New supply and exhaust duct as required by our design Leave ductwork uninsulated (open ceiling grid). Duct painting by others. Delta controls and control wiring Air balance
Locked on the free plan
ProPermit record
- Permit no.
- M-26-0452
- Municipality
- City of Milford
- Block / lot
- 096 915 11 C
- Trade
- HVAC / heating / cooling
- Work type
- Mechanical - C
Property
Assessor record- Type
- OFFICE BLD MDL-94
- Built
- 1988
- Living area
- 169,116 sq ft
- Appraised
- $9,900,000
- Last sold
- $4,450,000 · Jun 2024
At this property
7 other permits- HVAC / heating / cooling · Mechanical - C$3.6K · Aug 17
- General contractor · Alteration - C$145K · Aug 17
- General contractor · Addition/Alteration - C$139.9K · Aug 17
- Security / fire alarm / low voltage · Fire Alarm and Detection - C$5K · Aug 4
- General contractor · Alteration - C$18K · Aug 3
- Electrical · Electrical - C$25K · Jul 17