38 LAKE AVENUE
To modify the existing non-conforming use to another non-conforming use for the underlying zone and make related site improvements( increase in additional imperious) Hospital - Medical.; 25-3157p-PLU: connect to existing and provide new sanitary, vent and domestic water piping; install new hot water heater and fixtures. Basement: 1: wc, flr-drn., 2: snks., 1st fl.: 1: wc, snk.; 25-3157e-ELE: NIS is installing LV plenum cable for phones and computers. Working as a sub contractor to Vase Management. Greenwich Hospital, 38 Lake, Lower Level and 1st flr.; 25-3157h-HVAC: Install VRF heat pumps for doctor's office heating and cooling per plans and specs.; 25-3157e2-ELE: Interior renovations to office space; new subpanel, outlets, lights, swtchs., 24 swtchs., 32 outlets, 30 fixtures (86 total devices). Existing 200 amp. service. Existing meter
Locked on the free plan
ProPermit record
- Permit no.
- PLZE202500630-01
- Municipality
- Town of Greenwich
- Block / lot
- 07-1784
- Trade
- Plumbing / piping
- Work type
- NON-Res. - Add/alt. - less than 3000 sf
At this property
10 other permits- Plumbing / piping · SewerAug 10
- General contractor · Highway PermitJul 8
- General contractor · ELEFeb 20
- HVAC / heating / cooling · HVACFeb 19
- General contractor · ELEFeb 18
- Plumbing / piping · PLUFeb 12
- General contractor · BUI - Commercial$24.9K · Oct 14
- Roofing / siding / gutters · NON-Res. - Add/alt. - less than 3000 sf$24.9K · Oct 2
- Plumbing / piping · SewerSep 4