180 EAST ELM STREET
Cafeteria renovations at Julian Curtiss School, saw cutting, selective demo and ACM abatement, CMU repairs, carpentry, plastic paneling, roof penetrations, electrical, HVAC, plumbing, commercial kitchen with NFPA 96 hood. HVAC: furnish and install black-iron ductwork, sheet metal ductwork, chilled water, h/w piping per plans MAU RTU. Amendment (8/6/26): install kitchen hood and black iron ductwork per plans HVAC (2): Final field hookup of an UL300 approved factory installed wet chemical fire suppression system for the kitchen hood PLU: furnish and install new units (cast-iron/vent, domestic water, for kitchen renovation per plans). 1st fl.: 3: flr-drns. ELE: install control wiring for new RTU. 1 drop ELE (2): cafeteria renovation at Julian Curtis School, selective electrical demo, install new lighting and lighting controls, add 2 new power panels and feeders, install new feeder, install and wire a/v system, additional fire alarm devices to fire alarm system. Existing electrical service. 7 swtchs., 40 outlets, 86 fixtures (133 total devices).
Locked on the free plan
ProPermit record
- Permit no.
- 26-0279
- Municipality
- Town of Greenwich
- Block / lot
- 01-4502
- Trade
- General contractor
- Work type
- BUI - Commercial