1273 Niagara, Buffalo
Interior and exterior removals only in preparation for future work to be done on a separate permit as per plans submitted. Work to include: Interior removal of non-historic elements. Removal of any residual flooring down to subfloor, remove (pull or pound) all associated fasteners/nails to prep for new finishes. De-nail and clean as needed all interior framing members to accept new finishes. Remove any residual electrical, plumbing lines. Basement excavation. Minor repairs to interior framing members where rotted. *** Digeplan *** *** Attached Asbestos Survey *** <div><br></div><div>*** The contractor is responsible that all areas of the structure within the scope of work having identified or presumed ACM must only be disturbed by a licensed NYSDOL asbestos contractor and the asbestos clearance letter must be provided to the building inspector prior to final inspection. *** </div><div>*** Separate DPW approval and permit required for any work to be done on the City of Buffalo right-of-way. *** </div><div><div><br></div><div><br></div><div><br></div></div>
Locked on the free plan
ProPermit record
- Permit no.
- TEAR26-9683946
- Municipality
- Buffalo
- Block / lot
- 0992600010018000
- Trade
- Demolition
- Work type
- Interior Demolition / Tearout