The scope of work entails the conversion of a portion of the existing basement space to accommodate (7) Battery Energy Storage System (BESS) rooms. The balance of the basement area will continue to serve as utility and storage space. Construction requirements include a new egress point, installation of a dedicated sprinkler system, and the construction of 2-hour fire-rated walls and ceilings around the BESS rooms. <div><br></div><div>*** Digeplan *** *** Pos. asbestos survey attached - clean letter required prior to final inspection *** *** a separate electrical permit is required for connections *** </div>
Valuation
$300K
Filed
Oct 8, 2025
Lot
0998200001001300
Locked on the free plan
ProPermit record
- Permit no.
- GC25-9660715
- Municipality
- Buffalo
- Block / lot
- 0998200001001300
- Trade
- General contractor
- Work type
- General Construction
At this property
3 other permitsSame job